VALIDATION:
Validation
is an independent and objective assessment of the project activity, in
particular, whether the project design of the
proposed GHG project or CDM project activity, as relevant to the scheme above,
meets scheme specific such as CDM requirements. For this, using objective
evidence, URSV assesses the completeness and accuracy of the claims and
conservativeness of the assumptions made in the project design document (PDD).
The evidences used in the assessment are not limited to that provided by project
participant. In case of CDM Scheme, the approach for CDM validation shall be in
line with the latest version of CDM VVM manual. The brief validation process is
defined in foregoing paras.
Following
methods of validation, the validation is carried out ensuring below, but not
limited to:
·
In carrying out the validation work, it
shall be ensured that the project activity complies with the requirements of
scheme modalities and procedures such CDM modalities and procedures – such as
assessment of participant requirements,
·
Project design document and project
description is in accordance with scheme requirements,
·
Baseline and monitoring methodology
comply to the scheme requirements,
·
Additionality of the project activity,
as applicable, that how the project activity is additional in accordance with
scheme requirements,
·
Monitoring
and measuring plans that meets to the methodology used.
2.01 Document Review:
The
document review for the validation shall be involving:
(i)
A review of data and information to verify the correctness, credibility
and interpretation of presented information,
ii)
Cross checks between information provided in the project document or PDD
and information from sources other than that used, if available, and if
necessary independent background investigation.
2.02
On-site Assessment,
Interviews and Reviews:
URSV
team shall also carry out onsite assessment including interviews to assess the
project on GHG assertions in conformity with the requirement of applicable
standard or GHG program to which the responsible party subscribes. Process of
onsite assessment, interviews and reviews include:
·
Onsite interviews, telephone
or email interviews are conducted with data-coordinators, process
designers/engineer, key personnel at site, project proponent etc.
·
Such follow ups include
interview with relevant stakeholders and interested parties etc.
·
Cross checks between
information provided by interviewed personnel, by checking sources or other
interviews, to ensure that no relevant information has been omitted from the
validation,
·
Reference to available
information relating to projects or technologies similar to the proposed project
activity under validation,
·
Review, based on the approved
methodology being applied, of the appropriateness of formulae and correctness of
calculations,
·
The team shall assess the
methodology, derived based on project activity, objective, criteria, level of
assurance, materiality, project boundaries, baseline scenario for the project
including selection and quantification of GHG sources, sinks and reservoirs
applicable to it.
2.03 Stakeholder
Consultation Process:
·
URSV shall make the project
design document/PDD of the project under consideration publicly available in
accordance with the latest version of the “Procedure for processing and
reporting on validation of CDM project activity” or otherwise as stated as per
specific scheme.
2.04 Clarifications
and Corrections:
·
If during the validation of a
project activity based on information, document review and the assessment, (at
relevant stages) the issues are identified that need to be further elaborated
upon, researched or added to in order to confirm that the project activity meets
the requirements of the scheme, such as CDM and can achieve credible emission
reductions, these are ensured that these issues are correctly identified,
discussed and concluded in the validation report.
·
In case of validation
projects, corrective action request (CAR) shall be raised if one of the
following occurs:
·
the project does not meet the
requirements of the scheme such as CDM,
·
The project participants have
made mistakes that will influence the ability of the project activity to achieve
real, measurable additional emission reduction;
·
There is a risk that emission
reductions can not be monitored or calculated,
·
Clarification Request
(CL’s): A CL is issued where:
·
The information is
insufficient or not clear enough to determine whether the applicable scheme
requirement such as CDM, has been met.
·
Forward Action Request (FAR):
A FAR shall be issued when,
·
There is a requirement of
attention of issues in next stage or near future. The FAR is not related to
compliance of requirement of scheme such as CDM for registration etc.
2.05
Validation Reporting:
The
final validation report will reflect any adjustment made to the project after
the submission of the findings list. This final validation report will reflect
the corrective action and clarification requests, discussions and revisions of
project documents. Thus, the final validation report shall give the final
conclusions regarding the projects conformance with the relevant requirements. The
validation report forms the basis for certification and registration of project
at UNFCCC secretariat.
URS Climate Change Management Services
For more
information write us at : info@ursindia.com
URS offers various services worldwide and these services with accreditations where applicable, whilst following uniform management system, are operated by separate legal entities within the group. For status of individual scheme and accreditation, contact URS office or email at info@ursindia.com
|